Chapter 39The First 100 Days: Turn the Baseline Into Action
Vote on the proposals, hear the audio, read the reviews, search the whole plan.
In this chapter
- 39.1 What Changes After Day 30
- 39.2 The 100-Day Standard
- 39.3 No 100-Day Stunt Government
- 39.4 Day 100 Is a Checkpoint, Not an Expiry Date
- 39.5 The First 100-Day Council Work Plan
- 39.6 Protect the Regular City Agenda
- 39.7 First Public Commitments Register
- 39.8 Every Commitment Has an Owner
- 39.9 Public Authority Map
- 39.10 First Public Financial Baseline
- 39.11 Financial Dashboard Version One
- 39.12 Complete Cost Starts Now
- 39.13 First Efficiency Review
- 39.14 Efficiency Dividend Verification Standard
- 39.15 No Fake Saving From Deferral
- 39.16 No Saving From Vacant Position Unless Work Disappears
- 39.17 First Procurement Improvements
- 39.18 Local Vendor Gateway Version One
- 39.19 No Guaranteed Local Contract
- 39.20 Procurement Forecast
- 39.21 First Digital Exit Reviews
- 39.22 Cancel Unused Licences
- 39.23 Do Not Cancel Before Export
- 39.24 Service Catalogue Version One
- 39.25 Service Standards Version One
- 39.26 Service Standard Means a Meaningful Answer
- 39.27 Publish Exceptions
- 39.28 No Wrong Door Version One
- 39.29 Measure Wrong-Door Problems
- 39.30 Start-Up Desk Launch
- 39.31 One Start-Up Contact
- 39.32 Before You Sign Service
- 39.33 Ten-Business-Day Standard
- 39.34 The Clock Must Be Honest
- 39.35 Fee-Waiver Rule
- 39.36 Start-Up Scorecard
- 39.37 Business Red-Tape Log
- 39.38 Shop Local Payment Pilot
- 39.39 Merchant Payment Report
- 39.40 Debit-First Pilot
- 39.41 City Payment Review
- 39.42 Owen Sound Penny Design
- 39.43 Penny Funding Must Be Explicit
- 39.44 Penny Is Not Legal Tender
- 39.45 Penny Pilot Gate
- 39.46 Shop Local Directory Version One
- 39.47 Existing Directories Remain
- 39.48 Shop Local Delivery Feasibility Report
- 39.49 Private Delivery First
- 39.50 Delivery Pilot Only if Evidence Supports It
- 39.51 Community Pooling Test
- 39.52 First Pooling Question
- 39.53 Publish True Savings
- 39.54 First to Action Pilot
- 39.55 Start With a Few Categories
- 39.56 Emergency Reports Stay Separate
- 39.57 Public Status
- 39.58 Duplicate Reports
- 39.59 Councillors Use the Same System
- 39.60 Standing Work List
- 39.61 First Root-Cause Review
- 39.62 Employee Improvement Pilot
- 39.63 Labour Partnership Table
- 39.64 No Layoff Dividend
- 39.65 Infrastructure Index Version One
- 39.66 Public Condition Categories
- 39.67 Unknown Assets Get an Assessment Plan
- 39.68 First Five-Year Capital Look-Ahead
- 39.69 One Street, One Plan Pilot
- 39.70 Road-Transfer Decision Readiness
- 39.71 No Road-Transfer Victory Claim Yet
- 39.72 Hybrid Planning Decision
- 39.73 Applicant Experience Is the Test
- 39.74 Downtown Quick Fix Program
- 39.75 Quick Does Not Mean Sloppy
- 39.76 Downtown Operating Plan Version One
- 39.77 Vacancy Baseline
- 39.78 Downtown Development Desk
- 39.79 Civic Square Temporary Pilot
- 39.80 Tuesday Test Begins
- 39.81 2nd Avenue East Pilot Decision
- 39.82 Pilot Success Criteria Before Launch
- 39.83 River Spine Missing-Link Map
- 39.84 Missing Links Need Ownership Status
- 39.85 Owen Sound Outside Version One
- 39.86 Equipment Library Decision
- 39.87 Enthusiast Map Version One
- 39.88 Enthusiast Gap List
- 39.89 Housing Navigation Desk Launch
- 39.90 Housing Desk Is Not a Promise of Approval
- 39.91 Current Program Verification
- 39.92 Housing Options Guide Version One
- 39.93 Approved Is Not Built Dashboard
- 39.94 Municipal Land Inventory
- 39.95 Use Before Sell
- 39.96 Family-Friendly Neighbourhood Pilot
- 39.97 Do Not Create a Family Score for Residents
- 39.98 Seniors Independence Review Results
- 39.99 Free Senior Transit Decision
- 39.100 Pilot Before Permanent Fare Change
- 39.101 Senior Ride Feasibility
- 39.102 No Medical Requirement to Ride
- 39.103 Snow Brigade Pilot
- 39.104 Snow Brigade Boundaries
- 39.105 No Public Senior Vulnerability List
- 39.106 Community Safety Baseline Report
- 39.107 Safety Dividend Framework
- 39.108 Safety Dividend Preconditions
- 39.109 Capacity Dividend Comes First
- 39.110 Right Responder Table
- 39.111 First Right-Responder Pilot
- 39.112 No Police Dumping
- 39.113 Downtown Safety Work Plan
- 39.114 Lighting Audit
- 39.115 Fire Prevention Quick Wins
- 39.116 Community Partner Standard
- 39.117 Grant Register
- 39.118 Grant Is Not Contract
- 39.119 Faith-Neutral Public Standard
- 39.120 Community Resource Directory
- 39.121 Community Calendar Version One
- 39.122 Calendar Before Platform
- 39.123 No Paid Calendar Ranking
- 39.124 Civic Corps Pilot Approval
- 39.125 Paid Versus Volunteer
- 39.126 Youth Safety
- 39.127 Youth Opportunity Directory
- 39.128 Student Mapping Pilot
- 39.129 No Youth Inspection
- 39.130 Safe Information Workshops
- 39.131 Use Existing Institutions
- 39.132 Public Wi-Fi Decision
- 39.133 Recycled Phone Pilot Decision
- 39.134 Digital Systems Index Version One
- 39.135 AI Governance Version One
- 39.136 AI Does Not Decide Rights
- 39.137 map.ca Decision Gate One
- 39.138 Independent Review Begins Before Municipal Use
- 39.139 No Municipal map.ca Transfer by Day 100 Unless Extraordinary Review Is Complete
- 39.140 RealMap Public Standard Draft
- 39.141 No Sign-Rule Change Yet Unless Evidence Is Ready
- 39.142 Sign Consultation Plan
- 39.143 Sign Baseline
- 39.144 SON Leadership Relationship
- 39.145 No Prewritten Agreement
- 39.146 SON Relationship Inventory
- 39.147 Harbour Federal File
- 39.148 Harbour Public Questions Report
- 39.149 Harbour Due Diligence Scope
- 39.150 No Harbour Negotiation by Mayor Alone
- 39.151 Grey County Road Transfer Readiness
- 39.152 No Wrong Road
- 39.153 Grey County Housing Protocol
- 39.154 Paramedic Partnership Answer
- 39.155 Regional Transit Submission
- 39.156 Ontario Ask Book Version One
- 39.157 Strong-Mayor Position
- 39.158 Provincial Mandate Ledger Version One
- 39.159 Ontario Pilot Candidates
- 39.160 Federal Ask Book Version One
- 39.161 Federal Housing Information Correction
- 39.162 Broadband Evidence
- 39.163 East-West Crossing Year One Scope
- 39.164 Crossing Study Components
- 39.165 No-Build Alternative
- 39.166 Corridor Preservation
- 39.167 Community Input Before Route Commitment
- 39.168 Resident Pulse Version One
- 39.169 Publish Who Participated
- 39.170 Phone and Paper Alternatives
- 39.171 Vote Verification Development
- 39.172 No Political Profile
- 39.173 Mayor's Community Assembly Date
- 39.174 Public Questions in Advance
- 39.175 First State of the City Update
- 39.176 First "I Was Wrong" Requirement
- 39.177 Do Not Manufacture an Error for Optics
- 39.178 First Public Scorecard
- 39.179 Scorecard Colours Are Not Enough
- 39.180 Scorecard Categories
- 39.181 Completed Means Completed
- 39.182 Progress Is Still Worth Reporting
- 39.183 Missed Means Missed
- 39.184 Delayed by Another Government
- 39.185 Delayed by the City
- 39.186 First 100-Day Public Meeting
- 39.187 No Applause Requirement
- 39.188 What Day 100 Should Feel Like
- 39.189 What Day 100 Should Not Look Like
- 39.190 Early Savings Should Be Small and Credible
- 39.191 Early Failures Should Be Small Too
- 39.192 Pilot Portfolio
- 39.193 Maximum Pilot Capacity
- 39.194 Pilot Card
- 39.195 Pilot Expiry
- 39.196 Stop Conditions
- 39.197 Modification Is Not Failure
- 39.198 Public Money Spent on Failed Pilot
- 39.199 First 100-Day Accessibility Audit
- 39.200 Accessibility Fix Log
- 39.201 First Privacy Review Set
- 39.202 Data Minimization Test
- 39.203 First Cybersecurity Executive Report
- 39.204 Publish Governance, Not Vulnerability
- 39.205 First Canadian Capacity Review
- 39.206 Do Not Create a Canadian-Only Procurement Rule Overnight
- 39.207 Repair Before Replacement Pilot
- 39.208 Open Playbook Starts Now
- 39.209 Publish Reusable Templates Early
- 39.210 No Branding Requirement
- 39.211 First 100-Day Department Load Review
- 39.212 Prioritization Is Leadership
- 39.213 No Staff Burnout Strategy
- 39.214 Resident Workload Matters Too
- 39.215 Consultation Calendar
- 39.216 No Consultation After Decision
- 39.217 Council Amendments Are Part of the Plan
- 39.218 Opposition Is Information
- 39.219 Rights Do Not Go to Popular Vote
- 39.220 First 100-Day Rights Review
- 39.221 First 100-Day Conflict Review
- 39.222 No Favour Economy
- 39.223 No Punishment Economy
- 39.224 First Public Satisfaction Baseline
- 39.225 Do Not Manipulate Satisfaction Surveys
- 39.226 Complaint Data Is Improvement Data
- 39.227 Complaints About Staff
- 39.228 Complaints About Mayor
- 39.229 First Community Assembly
- 39.230 Mayor Answers Jurisdiction Questions Honestly
- 39.231 First 100-Day Intergovernmental Report
- 39.232 Do Not Claim Partnership Before Agreement
- 39.233 Day-100 Budget Impact
- 39.234 Reform Is Not Free
- 39.235 Day-100 Staffing Impact
- 39.236 First 100-Day External Consulting Register
- 39.237 Use Consultants for Expertise, Not Decisions
- 39.238 First 100-Day Risk Register
- 39.239 Risk Has an Owner
- 39.240 First 100-Day Unknowns Register
- 39.241 What Should Be Completed by Day 100
- 39.242 What May Be Piloting by Day 100
- 39.243 What Should Still Be Under Study
- 39.244 What Should Still Be Forbidden by Governance
- 39.245 The 100-Day Public Report
- 39.246 Include the Source Promise
- 39.247 Explain Necessary Changes
- 39.248 The Day-100 Mayor Statement
- 39.249 No 100-Day Victory Video as Substitute for the Report
- 39.250 First Independent Public Check
- 39.251 Finance Verifies Finance
- 39.252 Department Verifies Service Data
- 39.253 Residents Verify Experience
- 39.254 Professional Services Verify Technical Claims
- 39.255 Public Trust Comes From Separation
- 39.256 First 100-Day Exit Decisions
- 39.257 First 100-Day Expansion Decisions
- 39.258 First 100-Day Maintenance Decisions
- 39.259 The 100-Day Principle of Reversibility
- 39.260 The 100-Day Principle of Proportionality
- 39.261 The 100-Day Principle of Independence
- 39.262 The 100-Day Principle of Local Responsibility
- 39.263 The 100-Day Principle of Honest Dependency
- 39.264 The 100-Day Principle of Public Choice
- 39.265 The 100-Day Principle of Equal Service
- 39.266 The 100-Day Principle of Family and Community
- 39.267 The 100-Day Principle of Canadian Capacity
- 39.268 The 100-Day Principle of Open Failure
- 39.269 Day-100 Final Test
The first 30 days establish the operating system.
The next 70 days should prove that the operating system can produce results.
By Day 100, residents should not expect every four-year promise to be complete.
They should expect something much more important:
The City should be measurably easier to understand, easier to deal with and harder to manage by political improvisation.
The first 100 days should produce the first:
- public baselines;
- service standards;
- measurable pilots;
- intergovernmental files;
- financial controls;
- downtown improvements;
- housing navigation tools;
- business-service improvements;
- youth opportunities;
- senior-independence decisions;
- digital safeguards;
- public scorecard.
The principle is:
Move quickly on things that are lawful, affordable, reversible and understood. Move carefully on things that are expensive, coercive, technically complex or difficult to reverse.
Speed and discipline are not opposites.
Good government needs both.
39.1What Changes After Day 30
The first month is dominated by:
- listening;
- inventories;
- legal review;
- baselines;
- relationship building.
Days 31 through 100 should begin converting that work into four types of action.
Approve
Council makes decisions where the evidence is ready.
Pilot
Test uncertain ideas at limited scale.
Improve
Fix obvious operating problems using existing authority.
Escalate
Take properly prepared requests to:
- Grey County;
- Ontario;
- Canada;
- other partners.
Not everything should advance.
Some initiatives may remain:
Hold
because the evidence is not ready.
That is acceptable.
39.2The 100-Day Standard
Every initiative selected for first-100-day action should answer:
Problem
What are we fixing?
Authority
Who can decide?
Evidence
What did the first 30 days reveal?
Action
What exactly happens by Day 100?
Cost
What does it cost?
Funding
Where does the money come from?
Staff
Who does the work?
Partner
Who else must agree?
Legal
What review is required?
Measure
How will the public know whether it worked?
Exit
What happens if it does not work?
This becomes the implementation template for the rest of the term.
39.3No 100-Day Stunt Government
A first-100-day plan can create bad incentives.
Politicians may rush:
- hiring;
- spending;
- construction;
- announcements;
simply to claim:
100 promises in 100 days.
That is not the objective.
One sound change is worth more than ten rushed announcements.
39.4Day 100 Is a Checkpoint, Not an Expiry Date
Some decisions will not be ready by Day 100.
Examples may include:
- harbour acquisition;
- major bridge decision;
- permanent map.ca governance;
- long-term real-estate sign reform;
- major facility construction.
Do not force them through because the symbolic deadline arrived.
The Day-100 report can legitimately say:
Not ready. Here is what remains unresolved.
39.5The First 100-Day Council Work Plan
The Council agenda should concentrate on a manageable number of decisions.
Likely priority categories include:
- Open Government framework.
- Service standards.
- Start-Up Desk.
- First to Action.
- procurement improvements.
- road-transfer preparation.
- planning-service model.
- downtown quick fixes.
- housing navigation.
- seniors transit decision.
- Community Safety framework.
- Civic Corps pilot.
- Shop Local pilots.
- community partnership standards.
- digital governance.
- SON relationship framework.
- harbour federal file.
- crossing Year One study scope.
- first public scorecard.
That is already substantial.
39.6Protect the Regular City Agenda
Council must still deal with:
- planning applications;
- budgets;
- tenders;
- emergencies;
- existing capital projects;
- public delegations;
- statutory business.
The first 100 days should not turn every Council meeting into a campaign-platform workshop.
Implementation has to fit inside actual municipal government.
39.7First Public Commitments Register
By Day 100, the Four-Year Commitments Register should be public.
Every significant commitment should show:
Not Started
Baseline Complete
Under Review
Council Decision Scheduled
Partner Discussion
Pilot
Active
Completed
Stopped
Missed
A resident should be able to locate any major campaign promise and see its status.
39.8Every Commitment Has an Owner
By Day 100, every active commitment should identify:
- lead department;
- executive owner;
- Council decision where required;
- external partner where required.
No initiative should remain:
Everybody is working on it.
That usually means nobody owns it.
39.9Public Authority Map
The Authority Map should also be live.
Every major commitment receives:
City
Can act locally.
County
Requires Grey County.
Ontario
Requires provincial authority, funding or action.
Canada
Requires federal authority, funding or action.
SON
Requires a distinct Indigenous-government relationship or may engage rights and consultation processes.
Community
Requires another organization or private partner.
This is one of the simplest ways to make campaign promises honest.
39.10First Public Financial Baseline
By Day 100, residents should have a plain-language picture of:
- operating budget;
- major capital;
- debt;
- reserves;
- major outside funding;
- major contracts;
- unfunded infrastructure;
- major financial risks.
Not every accounting detail needs a dashboard.
The major financial picture should be understandable.
39.11Financial Dashboard Version One
Version One can be simple.
Possible fields:
Approved Budget
What Council authorized.
Actual to Date
What has been spent.
Variance
Difference.
Capital Project Status
Approved, spent, forecast.
Major Grants
Approved and received.
Debt
Outstanding and forecast.
Reserves
Current position.
Accuracy is more important than graphics.
39.12Complete Cost Starts Now
Every new report requesting significant spending should begin using the Financial Standard.
Show:
- initial cost;
- annual operating cost;
- staffing;
- maintenance;
- replacement;
- debt where applicable;
- grant expiry;
- lifecycle.
A proposal is not inexpensive merely because another government pays the first invoice.
39.13First Efficiency Review
Select a small number of processes for initial efficiency work.
Possible examples:
- software licences;
- duplicate subscriptions;
- printing;
- contract renewals;
- repetitive administrative steps.
Do not start with frontline staffing cuts.
Start where waste can be reduced without weakening service.
39.14Efficiency Dividend Verification Standard
Before any first Efficiency Dividend is declared:
Finance should verify:
Baseline
What did the City spend before?
Change
What was actually changed?
New Cost
What does the replacement cost?
Net Saving
What is left after all costs?
Recurring or One-Time
Which is it?
Service Impact
Did quality decline?
Only then does the saving enter the Dividend calculation.
39.15No Fake Saving From Deferral
If the City postpones:
- roof replacement;
- road rehabilitation;
- equipment purchase;
that is generally not an efficiency saving.
It may simply be:
a future liability.
Do not pay an Efficiency Dividend out of neglected maintenance.
39.16No Saving From Vacant Position Unless Work Disappears
A position being vacant does not automatically prove the City no longer needs the work.
Ask:
- was work stopped?
- absorbed?
- delayed?
- contracted?
- creating overtime?
Only a true net saving counts.
39.17First Procurement Improvements
By Day 100, Council should be able to consider the first procurement improvements.
Possible early actions:
- clearer vendor information;
- procurement forecast;
- simplified qualification guidance;
- quick-quote roster design;
- contract renewal controls.
The objective is:
Open the opportunity without weakening procurement discipline.
39.18Local Vendor Gateway Version One
The first version does not need complex software.
It can provide:
- how to register;
- where opportunities appear;
- insurance expectations;
- procurement thresholds;
- common documents;
- contact for questions.
A local small business should understand how to compete.
39.19No Guaranteed Local Contract
The Gateway must say clearly:
Registration does not guarantee work.
Procurement remains:
- fair;
- lawful;
- competitive.
39.20Procurement Forecast
Publish a forward-looking list of significant purchasing opportunities where legally and operationally appropriate.
Examples:
- vehicles;
- construction;
- maintenance;
- technology;
- professional services.
Advance notice allows businesses to prepare.
39.21First Digital Exit Reviews
Choose several major technology contracts nearing renewal.
For each:
Cost
Data held
Export capability
Contract expiry
Alternative supplier
Criticality
Migration difficulty
This begins digital-sovereignty reform with actual municipal systems.
39.22Cancel Unused Licences
If the first inventory identifies software licences that are genuinely:
- unused;
- duplicative;
and cancellation creates no operational harm:
Stop paying.
That may become one of the first verified efficiencies.
39.23Do Not Cancel Before Export
If an old system contains required municipal records:
Preserve or migrate them before cancellation.
Saving a licence fee is not worth losing the public record.
39.24Service Catalogue Version One
By Day 100, publish the first plain-language Service Catalogue.
Start with the most common services.
Each entry should answer:
What do I need?
Who handles it?
How do I contact them?
What happens next?
What is the normal response expectation?
Who do I contact if something goes wrong?
The Catalogue can expand continuously.
39.25Service Standards Version One
A reasonable first set may include selected services such as:
- basic information requests;
- business navigation;
- common public works reports;
- certain permit-status responses.
Do not publish unrealistic standards merely because:
fast sounds good.
The standard has to be deliverable.
39.26Service Standard Means a Meaningful Answer
A department should not satisfy a response standard by sending:
We received your email.
A meaningful response might be:
- answer;
- next step;
- missing information;
- assigned file;
- realistic timeline.
39.27Publish Exceptions
Service standards should explain situations involving:
- emergencies;
- incomplete applications;
- outside-agency approvals;
- unusually complex files.
A transparent exception is better than a hidden missed target.
39.28No Wrong Door Version One
By Day 100, frontline City staff should have a simple referral guide for common:
- County;
- Ontario;
- federal;
services.
Residents should increasingly hear:
That is handled by Grey County. Here is exactly where you go.
Not:
Not us.
39.29Measure Wrong-Door Problems
Create a simple staff mechanism to record recurring:
people keep calling us about this other service
issues.
That reveals where public information is failing.
39.30Start-Up Desk Launch
The original source proposes one City Hall window for someone starting a business, with a published ten-business-day answer standard or eligible fee waiver.
By Day 100, the Start-Up Desk should be operational in at least its first practical version.
39.31One Start-Up Contact
The first version should offer:
- one public contact;
- one process map;
- one checklist;
- coordinated internal routing.
It does not require a new storefront or department.
39.32Before You Sign Service
Launch the Before You Sign guidance.
A prospective business can ask about a location before committing financially.
The response should identify known municipal considerations such as:
- zoning;
- licence;
- occupancy;
- fire;
- building;
- accessibility;
- signage.
The response is preliminary.
It is not final approval.
39.33Ten-Business-Day Standard
If staff review confirms it is lawful and operationally realistic, Council should consider the promised ten-business-day standard for eligible Start-Up Desk matters.
The source promise is clear.
The refined rule should mean:
Within ten business days, receive the decision, a consolidated list of municipal requirements or a formal status explaining what remains outstanding.
39.34The Clock Must Be Honest
The public file should distinguish:
City Time
Time under municipal control.
Applicant Time
Waiting for applicant information.
Outside Time
Waiting for another authority.
Do not stop the clock invisibly.
39.35Fee-Waiver Rule
If Council adopts the fee guarantee:
Define exactly which:
- City-controlled fee;
- applicant;
- application type;
qualifies.
Do not promise to waive:
- provincial charges;
- federal charges;
- County charges;
- private professional fees.
The City cannot waive money it does not collect.
39.36Start-Up Scorecard
By Day 100 establish:
- files opened;
- response time;
- incomplete files;
- County referrals;
- approval or requirement outcomes;
- eligible fee waivers.
Do not count:
businesses contacted
as:
businesses created.
39.37Business Red-Tape Log
Start recording recurring complaints such as:
- duplicate forms;
- unclear zoning information;
- contradictory instructions;
- unnecessary municipal steps.
Every item should be classified:
City rule
City practice
County
Ontario
Canada
Fix the right layer.
39.38Shop Local Payment Pilot
The original source proposes a debit-first campaign based on the idea that payment costs can differ materially between card types.
By Day 100, Owen Sound should have current local evidence before launching any public claim about:
- percentage savings;
- cents per transaction.
39.39Merchant Payment Report
Using voluntary, privacy-respecting merchant participation:
Publish aggregate findings such as:
- typical payment methods;
- range of merchant costs;
- common concerns.
Do not publish one merchant's confidential contract.
39.40Debit-First Pilot
If evidence supports it:
Launch a small voluntary education pilot.
Possible message:
Ask your local merchant which payment method they prefer.
Not:
Credit cards are bad.
Not:
Everyone must use debit.
Choice stays with the customer.
39.41City Payment Review
The City should review its own payment-processing costs too.
If City Hall asks merchants to understand payment costs:
It should understand its own.
39.42Owen Sound Penny Design
The original source proposes the Owen Sound Penny as a $1 cross-business reward funded from value retained locally rather than as currency.
By Day 100, the concept should still be in:
design or pilot approval
unless a genuine funding source and operating model have been established.
39.43Penny Funding Must Be Explicit
Potential funding must identify an actual payer, such as:
- voluntary merchant contribution;
- sponsor;
- business association;
- lawful grant;
- other defined source.
Do not say:
payment savings fund the Penny
unless those savings are actually contributed.
39.44Penny Is Not Legal Tender
All public material should continue to say:
promotional reward
or
local loyalty reward.
Not:
- currency;
- municipal money.
39.45Penny Pilot Gate
Before Council authorizes a pilot:
Require:
- funding;
- accounting treatment;
- fraud controls;
- redemption rules;
- privacy;
- expiry rules;
- merchant eligibility;
- exit.
If those are not ready:
Delay it.
39.46Shop Local Directory Version One
If the directory gap identified in the first month is real:
Launch a simple neutral listing.
Basic fields:
- business name;
- category;
- location;
- hours;
- contact;
- website;
- ordering information;
- accessibility information where provided.
No paid basic ranking.
39.47Existing Directories Remain
The City directory should not require businesses to leave:
- Google;
- Chamber;
- BIA;
- other private systems.
Public discovery can coexist with private platforms.
39.48Shop Local Delivery Feasibility Report
The source proposes using existing municipal movement through the city to help local deliveries, with local couriers first and union-agreed duties.
By Day 100:
Publish whether that approach appears:
- lawful;
- insured;
- operationally useful;
- competitive;
- labour-compatible.
39.49Private Delivery First
If local courier or cooperative delivery can solve the problem:
Prefer that to turning municipal vehicles into a retail-delivery fleet.
Government should fill a market gap only where a public case exists.
39.50Delivery Pilot Only if Evidence Supports It
If a pilot proceeds:
Define:
- parcel types;
- custody;
- loss;
- routing;
- incremental cost;
- participant businesses;
- operating period.
Measure the real cost per delivery.
39.51Community Pooling Test
The original plan proposes combining community purchasing demand, giving local merchants the first chance to fill demand, and eventually considering a purchasing cooperative.
By Day 100:
Test one or two narrow categories.
Do not launch a municipal warehouse.
39.52First Pooling Question
Ask:
What are households or businesses repeatedly buying outside Owen Sound that might be purchased more efficiently together?
Then:
Can existing local merchants supply it competitively?
Local supply gets a fair opportunity.
Not an automatic contract.
39.53Publish True Savings
If pooling saves money:
Include:
- purchase price;
- shipping;
- storage;
- administration;
- handling;
- losses.
A cheaper unit cost is not always a cheaper final purchase.
39.54First to Action Pilot
By Day 100, the City should be capable of launching or approving a limited First to Action pilot.
The principle remains:
Report once. Route properly. Track appropriately. Finish the work. Close the loop.
39.55Start With a Few Categories
Do not put every municipal problem into the pilot.
Possible initial categories:
- potholes;
- damaged signs;
- public litter;
- streetlight concerns;
- minor park maintenance.
Choose categories with:
- clear ownership;
- clear workflow;
- manageable risk.
39.56Emergency Reports Stay Separate
The reporting tool must state prominently:
Do not use this for emergencies.
Emergency response continues through the proper emergency channels.
39.57Public Status
Where appropriate and privacy-safe:
Show simple status such as:
Received
Assigned
Scheduled
Completed
Not every internal work note belongs on the public map.
39.58Duplicate Reports
The pilot should recognize repeated reports of the same issue.
Residents should not need to submit a pothole fifty times to prove it matters.
39.59Councillors Use the Same System
A councillor reporting an ordinary maintenance issue should use the same operating workflow where practical.
Political access should not silently push one pothole ahead of another.
39.60Standing Work List
By Day 100, recurring work categories should be visible internally and, where useful, publicly summarized.
The original plan specifically proposes a standing work list for work such as potholes and low lighting.
This allows work to be:
- batched;
- prioritized;
- measured.
39.61First Root-Cause Review
Choose at least one recurring municipal complaint and ask:
Why does this keep happening?
Examples:
- repeated pothole;
- repeat flooding;
- repeated graffiti;
- recurring permit confusion.
Fixing cause can be more valuable than improving response speed.
39.62Employee Improvement Pilot
Select several staff-generated improvement ideas.
For each:
Problem
Idea
Cost
Trial
Result
This demonstrates that labour partnership creates operational value.
39.63Labour Partnership Table
By Day 100, establish the practical labour-partnership mechanism with appropriate employee representatives.
It should not replace:
- collective bargaining;
- grievance procedures;
- health and safety structures.
Its focus is:
- service improvement;
- root causes;
- workforce change.
39.64No Layoff Dividend
The original Safety Dividend specifically says no officer is laid off to create the saving.
The same underlying integrity should guide the broader Efficiency Dividend:
Do not manufacture savings by removing people while leaving the work undone.
39.65Infrastructure Index Version One
By Day 100, publish the first understandable Infrastructure and Systems Index summary.
It does not need every asset.
It should show the structure.
Possible first categories:
- roads;
- bridges;
- water;
- wastewater;
- buildings;
- parks;
- fleet;
- major digital systems.
39.66Public Condition Categories
Use simple public categories:
Very Good
Good
Fair
Poor
Very Poor
Unknown
Where information is professional or technical:
Link to the source where appropriate.
39.67Unknown Assets Get an Assessment Plan
An unknown should receive:
- owner;
- expected assessment;
- priority.
Do not leave:
Unknown
forever.
39.68First Five-Year Capital Look-Ahead
Publish a high-level five-year view of major known infrastructure requirements.
Label:
Approved
Planned
Forecast
Under Study
Unfunded
This prevents residents from assuming:
planned
means:
already funded.
39.69One Street, One Plan Pilot
Choose one upcoming corridor where multiple infrastructure needs overlap.
Coordinate:
- pavement;
- water;
- sewer;
- sidewalks;
- lighting;
- accessibility.
Use it as a demonstration of integrated capital planning.
39.70Road-Transfer Decision Readiness
By Day 100, the road-transfer file with Grey County should include:
- road segments;
- asset condition;
- transition funding;
- operating cost;
- winter plan;
- capital risks;
- permit implications.
If information is missing:
Identify it publicly.
39.71No Road-Transfer Victory Claim Yet
Transfer money received from Grey County should not be described as:
profit
or:
savings.
It is part of a larger asset and liability transfer.
The real result will take years to measure.
39.72Hybrid Planning Decision
If Grey County's planning-service decision requires action within the first 100 days:
Council should receive a complete business case.
It should compare:
Current model
Proposed hybrid model
Cost
service time
local knowledge
staffing
governance
exit
Then Council decides.
39.73Applicant Experience Is the Test
The planning question is not:
Which government employs the planner?
It is:
Does the applicant get a faster, clearer and professionally sound answer?
39.74Downtown Quick Fix Program
By Day 100, obvious low-cost maintenance issues identified in the downtown baseline should begin moving.
Possible examples after staff review:
- damaged public fixtures;
- litter;
- minor wayfinding;
- graffiti response;
- lighting maintenance;
- neglected public furniture.
Fix the things that do not require a master plan.
39.75Quick Does Not Mean Sloppy
Even a small improvement may require:
- accessibility;
- procurement;
- maintenance;
consideration.
Fast government still follows rules.
39.76Downtown Operating Plan Version One
Publish a simple seasonal operating plan covering:
- cleaning;
- maintenance;
- public washrooms;
- events;
- construction;
- loading;
- safety coordination;
- snow.
Downtown management should be operational.
Not only visionary.
39.77Vacancy Baseline
Create a factual vacancy inventory where information can be lawfully and reliably established.
Do not create:
bad landlord list.
The purpose is understanding:
- empty space;
- upper-floor opportunity;
- barriers.
39.78Downtown Development Desk
Designate a clear contact for significant downtown:
- redevelopment;
- upper-floor housing;
- adaptive reuse;
navigation.
Again:
One contact.
Not necessarily one new employee.
39.79Civic Square Temporary Pilot
If the baseline supports it and Council/staff approvals are in place:
Test temporary:
- seating;
- shade;
- movable furniture;
- games;
- small programming.
Then observe ordinary use.
39.80Tuesday Test Begins
The Civic Square should be measured on:
an ordinary Tuesday
as well as an event day.
A place needing constant programming to feel alive may be poorly designed for ordinary life.
39.812nd Avenue East Pilot Decision
By Day 100, Council should ideally know whether the seasonal pilot is:
Ready
Needs Modification
Not Ready
based on:
- business consultation;
- resident input;
- traffic;
- emergency access;
- deliveries;
- transit;
- accessibility;
- parking;
- cost.
Do not schedule closure before those questions are answered.
39.82Pilot Success Criteria Before Launch
If approved:
Publish in advance:
Pedestrian activity
Business experience
accessibility
traffic
parking
safety
cost
resident feedback
Then compare after the pilot.
39.83River Spine Missing-Link Map
By Day 100, publish the first public version showing:
- current public route;
- gaps;
- alternate route;
- public facilities.
Do not map private land as though public access exists.
39.84Missing Links Need Ownership Status
For each gap:
City-controlled
Other public owner
Private
Unknown
This keeps future proposals realistic.
39.85Owen Sound Outside Version One
Launch a simple Where Do I Start? guide for selected outdoor activities.
Possible activities:
- walking;
- cycling;
- paddling;
- skating;
- hiking.
For each:
Where
Beginner option
Equipment source
Club or business
accessibility information
seasonal safety information
The City connects.
Others provide depth.
39.86Equipment Library Decision
Do not buy a large City recreation inventory automatically.
By Day 100, identify whether:
- library;
- YMCA;
- private rental;
- clubs;
already provide equipment access.
Fill a proven gap only.
39.87Enthusiast Map Version One
The first Enthusiast Map can organize:
- activity;
- club;
- store;
- repair;
- event;
- instruction.
No paid ranking.
No claim that the City endorses each provider.
39.88Enthusiast Gap List
Ask participants:
What do you routinely leave Owen Sound to buy, repair, learn or rent?
Publish aggregate opportunity categories.
That can feed the Start-Up Desk.
39.89Housing Navigation Desk Launch
By Day 100, launch the first practical Housing Navigation service.
It should help residents understand:
- additional units;
- garden suites where applicable;
- renovations;
- approvals;
- accessibility;
- County housing supports;
- current outside financing programs.
39.90Housing Desk Is Not a Promise of Approval
Every guide should say:
Property-specific approval depends on applicable law, site conditions and complete review.
Navigation is not pre-approval.
39.91Current Program Verification
All federal or provincial housing incentives included in the guide should show:
- current status;
- source;
- last verified date.
Do not repeat campaign-era program assumptions indefinitely.
39.92Housing Options Guide Version One
Publish plain-language information on:
- secondary suites;
- multigenerational housing;
- smaller units;
- accessible options;
- downtown upper floors;
- adaptive reuse.
Show which questions need:
- planner;
- building official;
- County;
- other professional.
39.93Approved Is Not Built Dashboard
Begin separating:
- application;
- approval;
- permit;
- construction;
- occupancy.
This protects housing statistics from political inflation.
39.94Municipal Land Inventory
By Day 100, identify City-owned land potentially relevant to:
- housing;
- economic development;
- public use.
This is an inventory.
Not a promise to sell or develop each parcel.
39.95Use Before Sell
Before disposing of City land:
Ask:
Does the City need this asset for a foreseeable public purpose?
Public land should not be treated as an easy one-time revenue source without long-term analysis.
39.96Family-Friendly Neighbourhood Pilot
Choose one neighbourhood walk-through or planning exercise using the Family Impact and Neighbourhood tests.
Look at:
- sidewalk;
- crossing;
- park;
- bench;
- transit;
- lighting;
- winter.
This turns the principle into practical planning.
39.97Do Not Create a Family Score for Residents
The Family-Friendly framework evaluates:
- municipal design;
- services.
It does not judge which households count as:
good families.
Public service remains equal.
39.98Seniors Independence Review Results
By Day 100, publish the first findings from the Seniors Independence Review.
Possible categories:
- transportation;
- winter;
- housing;
- digital access;
- public space;
- recreation.
Focus on barriers.
Not stereotypes.
39.99Free Senior Transit Decision
The source proposes free bus fares for seniors.
By Day 100, Council should ideally receive the business case.
It should show:
Eligibility
Current ridership
Fare revenue
Capacity
Administrative cost
Estimated additional trips
Pilot term
Measure
Then Council decides.
39.100Pilot Before Permanent Fare Change
If approved:
Use a defined pilot where practical.
Measure:
- ridership;
- trip purpose through optional aggregate survey;
- cost;
- capacity;
- accessibility;
- resident experience.
Do not treat:
free
as the measure of success.
Independence is the outcome.
39.101Senior Ride Feasibility
The source also proposes scheduled rides with a nurse or community paramedic aboard.
By Day 100, Owen Sound should know whether Grey County or another appropriate health partner sees a viable role.
The transportation model should be evaluated even if no clinician participates.
39.102No Medical Requirement to Ride
Any future senior community ride should not require a resident to disclose private medical information merely to access transportation unless a specific clinical service legitimately requires it.
Transport first.
Medical participation optional and properly governed.
39.103Snow Brigade Pilot
If winter timing makes it relevant, launch a limited snow-help program only after:
- safety;
- insurance;
- task;
- participant;
rules are established.
The source proposal specifically contemplates snow brigades for seniors' private walks.
39.104Snow Brigade Boundaries
Appropriate work might include:
- ordinary walkway clearing.
Not:
- roof clearing;
- dangerous ice removal;
- operating heavy equipment;
- municipal road work.
High-risk work remains professional.
39.105No Public Senior Vulnerability List
Requests can be managed privately.
Public mapping should show:
- program;
- contact.
Not the homes of residents needing help.
39.106Community Safety Baseline Report
By Day 100, publish a public Community Safety baseline using appropriate aggregate data.
Potential areas:
- police demand;
- violent incidents;
- property incidents;
- traffic;
- fire;
- repeat calls;
- downtown perception;
- by-law demand.
Use professional definitions.
39.107Safety Dividend Framework
The source proposes that prevention could reduce police demand, allowing officers to shift toward youth/community work and savings to occur only through voluntary retirement or attrition, with no officer laid off.
By Day 100, Council should approve or consider the framework, not claim the savings already exist.
39.108Safety Dividend Preconditions
Before any financial dividend:
- baseline call demand established;
- service change identified;
- workload reduction demonstrated;
- public safety maintained;
- professional police planning supports staffing implications;
- collective agreements respected;
- savings verified by Finance.
No shortcut.
39.109Capacity Dividend Comes First
The first benefit may be:
- more proactive time;
- better community work;
- less repeat response.
That is valuable even if the budget does not immediately fall.
Do not force a financial saving where the real benefit is capacity.
39.110Right Responder Table
Establish the cross-service Community Safety Partnership Table if evidence shows value.
Possible participation depending on topic:
- police;
- fire;
- County;
- health;
- housing;
- by-law;
- community organizations.
Do not discuss identifiable residents publicly.
39.111First Right-Responder Pilot
Choose one recurring non-emergency call type where another service may potentially handle part of the problem better.
Define:
- current police demand;
- proposed responder;
- safety limits;
- referral;
- cost;
- measure.
Pilot carefully.
39.112No Police Dumping
A Right Responder model should not simply move:
- difficult;
- dangerous;
calls to undertrained workers or volunteers.
The new responder must actually be appropriate.
39.113Downtown Safety Work Plan
Combine:
- police;
- infrastructure;
- lighting;
- cleaning;
- outreach;
- public-space management.
Do not treat downtown safety as only a policing problem.
39.114Lighting Audit
The original source identifies low lighting as a standing work item and notes that a lit street can contribute to safety.
By Day 100, complete the first targeted lighting audit.
Ask:
- fixture working?
- location appropriate?
- glare?
- dark gap?
- pedestrian need?
More light is not always better light.
39.115Fire Prevention Quick Wins
If fire leadership identifies inexpensive improvements involving:
- public education;
- hydrant visibility;
- access;
- inspection workflow;
move them.
Do not wait for the entire safety strategy.
39.116Community Partner Standard
By Day 100, adopt or present the Community Partnership Standard.
Every significant partnership should define:
- public purpose;
- roles;
- money;
- in-kind support;
- insurance;
- accessibility;
- privacy;
- labour boundaries;
- term;
- measurement;
- exit.
39.117Grant Register
Create a public list of significant municipal grants and in-kind support to outside organizations.
Where lawful:
Show:
- recipient;
- amount;
- purpose;
- term.
No hidden community funding.
39.118Grant Is Not Contract
The first-100-day framework should distinguish:
Grant
Support for an independent public-benefit activity.
Contract
City purchases a defined service.
Do not use grants to bypass procurement.
39.119Faith-Neutral Public Standard
Publicly supported service should not be conditioned upon:
- worship;
- conversion;
- political support;
- religious membership.
Faith organizations may still participate under the same public-purpose rules as secular organizations.
39.120Community Resource Directory
If no adequate current system exists:
Launch or improve a basic resource directory.
Possible categories:
- food;
- recreation;
- youth;
- seniors;
- volunteer;
- community supports.
Map the resource.
Not the person using it.
39.121Community Calendar Version One
The source proposes a free community calendar with no advertising and no tracking.
A first version could be appropriate within 100 days if:
- governance;
- moderation;
- accessibility;
- privacy;
are ready.
39.122Calendar Before Platform
The City can establish the calendar standard even if it does not adopt:
- map.ca.
If existing City software can perform the function:
Use it.
Public purpose first.
39.123No Paid Calendar Ranking
Basic event visibility should not be sold.
Use transparent sorting:
- date;
- location;
- category.
39.124Civic Corps Pilot Approval
By Day 100, Council should be able to consider a first Civic Corps pilot.
Potential areas:
- public mapping;
- environmental stewardship;
- community event support;
- local history;
- simple public-realm work.
All roles must be age and risk appropriate.
39.125Paid Versus Volunteer
Every Civic Corps role should be classified.
Paid
Where the City is receiving real recurring productive work that should be employment.
Volunteer
Where participation is genuinely civic and optional.
Co-op
Where an educational institution governs the placement framework.
Do not blur categories for convenience.
39.126Youth Safety
Before placement:
Define:
- supervision;
- equipment;
- transportation;
- personal-data access;
- hazardous tasks;
- incident reporting.
Youth participation should be real.
Not reckless.
39.127Youth Opportunity Directory
By Day 100, launch the first public list of:
- jobs;
- co-op;
- volunteer;
- recreation;
- clubs;
- training.
Youth should be able to browse without creating a permanent behavioural profile.
39.128Student Mapping Pilot
An early pilot may collect public observations such as:
- bench location;
- trail signage;
- public-space feature.
The rule remains:
Students Gather. Staff Validate. Public Uses.
39.129No Youth Inspection
Youth do not certify:
- bridges;
- accessibility;
- electrical systems;
- building safety.
The City does not use a youth program to avoid professional work.
39.130Safe Information Workshops
By Day 100, begin or schedule plain-language community education through appropriate partners.
Topics may include:
- passwords;
- backups;
- scam awareness;
- photo preservation;
- document organization;
- privacy.
The source specifically proposes plain-language information stewardship so families can preserve photos, records and history.
39.131Use Existing Institutions
Partner first with:
- library;
- schools;
- community organizations;
- qualified volunteers or professionals.
Do not create a municipal technology-training bureaucracy unnecessarily.
39.132Public Wi-Fi Decision
If the first-30-day baseline identifies obvious public connectivity gaps:
Council may consider limited expansion in appropriate public spaces.
Any expansion needs:
- cybersecurity;
- privacy;
- cost;
- operations.
Do not confuse Wi-Fi with city-wide broadband.
39.133Recycled Phone Pilot Decision
If the device-reuse study finds a safe, useful model:
Consider a small pilot.
Requirements may include:
- secure wipe;
- account removal;
- battery inspection;
- e-waste process;
- distribution criteria;
- support limits.
Do not promise emergency functionality beyond what is verified.
39.134Digital Systems Index Version One
By Day 100, the internal Digital Systems Index should be substantially established.
The public version can report safe high-level information such as:
- system count;
- major renewals;
- legacy systems;
- exit risks.
Do not publish attack surfaces.
39.135AI Governance Version One
By Day 100, establish a practical municipal AI policy.
At minimum:
Approved uses
prohibited sensitive-data uses
human responsibility
verification
vendor review
records implications
Keep it understandable.
39.136AI Does Not Decide Rights
No high-consequence municipal decision should be delegated to an unaccountable AI system merely because the technology is available.
A responsible human remains accountable.
39.137map.ca Decision Gate One
By Day 100, the first map.ca public-infrastructure review should answer:
What public problem is being solved?
What assets actually exist?
Who owns them?
What interest does the Mayor retain?
What open standard could solve the problem?
What alternatives exist?
No predetermined municipal adoption.
39.138Independent Review Begins Before Municipal Use
Where the concept continues:
Start independent:
- legal;
- conflict;
- valuation;
- privacy;
- cybersecurity;
- accessibility;
- financial;
review.
The Mayor does not select the conclusion.
39.139No Municipal map.ca Transfer by Day 100 Unless Extraordinary Review Is Complete
The default assumption should be:
No transfer within 100 days.
A public infrastructure transaction is too consequential to rush for an implementation milestone.
39.140RealMap Public Standard Draft
By Day 100, publish or consider the first platform-neutral Public Property Information Standard.
It can define expectations such as:
- current status;
- useful photos;
- accessibility information;
- source;
- professional/private seller pathways;
- no paid basic ranking.
The standard can exist without RealMap.
39.141No Sign-Rule Change Yet Unless Evidence Is Ready
The real-estate sign transition should still be primarily in baseline and consultation during the first 100 days.
No rushed ban.
Enforce existing rules first.
39.142Sign Consultation Plan
Prepare consultation with:
- sellers;
- buyers;
- real-estate professionals;
- private sellers;
- sign companies;
- residents.
Ask:
What information does the sign currently provide that must not be lost?
39.143Sign Baseline
Measure:
- number;
- duration;
- non-compliance;
- stale signs;
- streetscape perceptions.
Do not design the answer before measuring the current system.
39.144SON Leadership Relationship
By Day 100, the City should aim, subject to SON's willingness and scheduling, to have completed an initial leadership conversation.
The source commitment is to build a relationship with SON and listen first.
That principle should govern the meeting.
39.145No Prewritten Agreement
The first 100 days should not be judged by whether an MOU is signed.
A stronger result may be:
- appropriate contacts established;
- priorities understood;
- next steps agreed.
Relationship before document.
39.146SON Relationship Inventory
By Day 100, City staff should know:
- existing joint work;
- past commitments;
- active files;
- appropriate contacts.
Institutional memory should not depend on one person.
39.147Harbour Federal File
By Day 100, Owen Sound should have formally asked Canada for the key harbour information.
At minimum:
- ownership;
- assets;
- transfer status;
- condition;
- dredging;
- environmental liability;
- leases;
- operating cost;
- available federal support.
39.148Harbour Public Questions Report
Publish:
Answered
Partially Answered
Outstanding
Do not announce a municipal acquisition decision merely because the federal government responded.
39.149Harbour Due Diligence Scope
If transfer discussion appears serious:
Prepare the scope for:
- engineering;
- environmental;
- financial;
- legal;
due diligence.
Council should approve significant study cost where required.
39.150No Harbour Negotiation by Mayor Alone
Any major transfer process should be handled through:
- Council authority;
- professional staff;
- legal advice.
The Mayor may advocate.
The institution negotiates.
39.151Grey County Road Transfer Readiness
By Day 100, both governments should have a working implementation list for the road transfer.
Fields:
- asset data;
- maintenance;
- permits;
- winter;
- funding;
- legal transfer;
- public communications.
No responsibility gaps.
39.152No Wrong Road
On transfer day, a resident should be able to report a road issue without hearing:
We're not sure whether that's still the County.
The public routing system must be updated in advance.
39.153Grey County Housing Protocol
By Day 100, establish a practical referral relationship between:
- City Housing Navigation;
- County housing and homelessness services.
The City does not become a shadow County department.
39.154Paramedic Partnership Answer
The City should know by Day 100 whether Grey County is interested in further evaluation of:
- seniors transportation;
- community paramedicine interface;
- other safety partnerships.
If the answer is no:
Record it.
Do not continue publicly promising County participation.
39.155Regional Transit Submission
Submit Owen Sound's evidence and priorities into the regional transit process early enough to matter.
Key issues:
- City connections;
- schedules;
- accessibility;
- healthcare;
- employment;
- seniors;
- first/last mile.
39.156Ontario Ask Book Version One
By Day 100, publish Owen Sound's first short Provincial Ask Book.
Avoid a long wish list.
Priority requests may include only matters that:
- require Ontario;
- have evidence;
- are ready.
39.157Strong-Mayor Position
If Council wishes to request removal or reform of Owen Sound's strong-mayor designation:
By Day 100, send the precise request to Ontario.
Do not claim the designation has changed until Ontario changes it.
39.158Provincial Mandate Ledger Version One
Publish the first verified entries.
Each should identify:
- provincial requirement;
- local cost;
- provincial funding;
- net effect.
Do not use the Ledger as partisan commentary.
39.159Ontario Pilot Candidates
Select at most a few municipal reform ideas that genuinely require provincial flexibility.
For each:
- authority requested;
- term;
- safeguards;
- measure;
- sunset.
Do not ask for vague:
more municipal power.
39.160Federal Ask Book Version One
Likewise, publish the first federal priorities.
Likely early file:
- harbour.
Other issues should only appear if the federal role is clear.
39.161Federal Housing Information Correction
By Day 100, the Housing Desk should have corrected any outdated campaign description of federal financing programs.
Accuracy beats preserving wording from the campaign.
39.162Broadband Evidence
By Day 100, answer:
Does Owen Sound actually have a broadband infrastructure gap?
If the main barrier is:
- affordability;
- device access;
- digital literacy;
do not propose a fibre network to solve the wrong problem.
39.163East-West Crossing Year One Scope
By Day 100, Council should be able to consider a scoped Year One business-case study.
The study question should remain:
Does Owen Sound need another major northern east-west connection across the inner harbour or Sydenham corridor, and if so, what alternative best solves the demonstrated problem?
Not:
How do we justify the bridge we already decided to build?
39.164Crossing Study Components
The first scope should include:
- current traffic;
- emergency response;
- existing bridge capacity;
- active transportation;
- corridor options;
- property;
- navigation;
- environment;
- SON;
- cost;
- economic benefit;
- no-build alternative.
39.165No-Build Alternative
Every serious crossing study must include:
Do not build another crossing
as a real alternative.
If the study cannot recommend no project:
It is advocacy, not analysis.
39.166Corridor Preservation
Where existing planning protects possible routes:
Do not accidentally allow decisions that destroy them before the business case concludes.
Preservation is not approval.
39.167Community Input Before Route Commitment
Residents and affected businesses should understand:
- the problem being studied;
- the alternatives.
Do not ask them only:
Which bridge location do you prefer?
if:
no bridge
remains a valid option.
39.168Resident Pulse Version One
Launch a limited Resident Pulse on ordinary municipal questions.
Use it to test:
- accessibility;
- participation;
- public reporting.
Do not use an early voluntary poll to decide individual rights or substitute for statutory processes.
39.169Publish Who Participated
When reporting a Pulse:
Show:
- number of participants;
- participation method;
- broad limits.
Do not say:
Owen Sound believes...
when 312 self-selected respondents participated.
Say:
Among the people who responded...
39.170Phone and Paper Alternatives
For important public consultation:
Provide reasonable non-digital participation.
Resident Government cannot become:
smartphone democracy.
39.171Vote Verification Development
If the Strong Vote system continues toward digital verification:
By Day 100, publish the privacy and governance requirements before selecting technology.
Verify the person.
Protect the opinion.
39.172No Political Profile
Participation in one municipal consultation should not become part of a permanent political profile.
Consultation data should never become campaign data.
39.173Mayor's Community Assembly Date
Set the first Community Assembly date and publish its purpose.
It should include:
- baseline;
- first results;
- resident questions;
- major upcoming choices.
Not a campaign rally.
39.174Public Questions in Advance
Allow residents to submit questions before the assembly.
Group duplicates.
Do not exclude critical questions merely because they are uncomfortable.
39.175First State of the City Update
Around Day 100, publish the second operational update after the Day-30 baseline.
The structure should include:
What Changed
What Did Not Change
What We Learned
What Worked
What Did Not Work
What Is Late
What Needs Council
What Needs Another Government
This should become routine.
39.176First "I Was Wrong" Requirement
By Day 100, if a material campaign assumption has proven incorrect:
Say so.
Do not wait until Year Four.
A good administration should be able to say:
We expected X. The evidence shows Y. We are changing course.
39.177Do Not Manufacture an Error for Optics
Likewise, do not perform humility theatrically.
If a major assumption was not wrong:
Do not invent one.
Correction is valuable because it is truthful.
39.178First Public Scorecard
Day 100 should produce the first full public scorecard.
The goal is not to show many green boxes.
The goal is to establish the discipline that will govern the term.
39.179Scorecard Colours Are Not Enough
Every score should link to:
- measure;
- baseline;
- source;
- target;
- status.
A green dot with no definition is decoration.
39.180Scorecard Categories
The first version should preview the permanent categories later developed in Part XVI.
Finance
Tax pressure
Services
Infrastructure
Downtown
Housing
Business
Safety
Recreation
Youth
Accessibility
Privacy and information
Environment
Partnerships
Resident satisfaction
Commitments completed
Commitments missed
The exact measures will mature.
39.181Completed Means Completed
A commitment is not completed because:
- staff report ordered;
- meeting held;
- funding application sent.
Completion must correspond to the promise.
If the promise was:
launch the Start-Up Desk
then:
studying a Start-Up Desk
is not completion.
39.182Progress Is Still Worth Reporting
The fact that an initiative is not complete does not mean nothing happened.
Report:
40 per cent
only if that percentage has a defensible meaning.
Otherwise use milestone status.
39.183Missed Means Missed
If a Day-100 target was:
publish the service catalogue
and it is not published:
Mark:
Missed
then explain:
- why;
- new date;
- lesson.
No quiet deadline changes.
39.184Delayed by Another Government
If delay belongs partly to:
- County;
- Ontario;
- Canada;
show:
City submitted
Partner response due
current status
Do not blame vaguely.
39.185Delayed by the City
If the City failed to submit information on time:
Say that.
Accountability only works when it applies inward.
39.186First 100-Day Public Meeting
Hold a public review near or after Day 100.
Structure:
- commitments;
- finance;
- service;
- major projects;
- failures;
- next steps;
- resident questions.
Keep presentation concise enough to leave time for residents.
39.187No Applause Requirement
Residents attending a public review do not need to:
- celebrate;
- agree.
Criticism is part of the exercise.
39.188What Day 100 Should Feel Like
A resident should begin noticing:
- clearer answers;
- clearer responsibility;
- visible service standards;
- easier business navigation;
- better issue tracking;
- more transparent finances;
- better intergovernmental information.
Not every resident will use every tool.
The institutional difference should be visible.
39.189What Day 100 Should Not Look Like
It should not look like:
- dozens of new City employees;
- massive new bureaucracy;
- major untested spending;
- emergency by-law changes;
- forced platform adoption;
- bridge construction;
- harbour acquisition;
- police layoffs;
- permanent road closures;
- rushed constitutional declarations.
The first 100 days establish momentum without sacrificing judgement.
39.190Early Savings Should Be Small and Credible
If the first verified efficiency is:
$12,000 in cancelled duplicate software licences
publish it.
Do not feel pressure to claim:
millions saved
before evidence supports it.
Small real savings build credibility.
39.191Early Failures Should Be Small Too
That is one purpose of pilots.
If a $5,000 pilot fails:
We learned cheaply.
If a $5 million permanent program fails:
The lesson is much more expensive.
39.192Pilot Portfolio
By Day 100, the City may have several small pilots.
Possible examples:
- First to Action;
- Civic Square temporary use;
- Resident Pulse;
- Shop Local payment education;
- Civic Corps;
- senior transit;
- equipment access.
Not every pilot needs to start simultaneously.
Staff capacity matters.
39.193Maximum Pilot Capacity
The City Manager should advise Council how many active pilots the organization can reasonably:
- operate;
- measure;
- support.
Too many experiments create no learning because nobody has time to evaluate them.
39.194Pilot Card
Every pilot should have a one-page public card.
Problem
Start
End
Cost
Partner
Population served
Measure
Stop conditions
Final decision date
Simple.
39.195Pilot Expiry
A pilot should expire unless:
- Council;
- authorized staff;
deliberately extends or adopts it under the proper process.
No silent permanency.
39.196Stop Conditions
Examples may include:
- safety issue;
- unacceptable cost;
- legal issue;
- failure of partner;
- service disruption.
Publish these before launch where practical.
39.197Modification Is Not Failure
A pilot may reveal:
The concept works, but the schedule is wrong.
Modify.
The choices are not only:
- keep;
- kill.
Learning is the purpose.
39.198Public Money Spent on Failed Pilot
If a pilot fails:
Publish the cost.
Do not hide it.
Then explain:
What larger cost did this test help us avoid?
If there was no useful learning:
Say that too.
39.199First 100-Day Accessibility Audit
Select key new public-facing tools and test them for accessibility.
Examples:
- dashboard;
- Service Catalogue;
- Start-Up Desk;
- Resident Pulse;
- community calendar.
Do this before habits become entrenched.
39.200Accessibility Fix Log
Where issues are found:
Record:
- issue;
- priority;
- correction date.
Accessibility is ongoing maintenance.
39.201First Privacy Review Set
Complete privacy reviews for the highest-risk early tools:
- Resident Pulse verification;
- youth systems;
- map.ca-related evaluation;
- public issue reporting;
- community directory where personal information is involved.
Low-risk systems should not be burdened unnecessarily.
39.202Data Minimization Test
Every new form should be asked:
Do we actually need this field?
If not:
Remove it.
The safest personal data is data the City never collected.
39.203First Cybersecurity Executive Report
Council should receive a protected briefing at an appropriate level on:
- major cyber risks;
- unsupported systems;
- backup readiness;
- major funding need.
The public should receive a safe summary.
39.204Publish Governance, Not Vulnerability
The public can know:
The City has identified three high-priority legacy-system risks.
It does not need:
- system name;
- exploitable version;
- exposed endpoint.
Open government still uses judgement.
39.205First Canadian Capacity Review
Choose a small number of critical municipal supply categories.
Ask:
- current supplier;
- alternate;
- Canadian option;
- repair availability;
- lead time.
This begins Canadian-independence work in a measurable way.
39.206Do Not Create a Canadian-Only Procurement Rule Overnight
Any procurement change requires:
- legal;
- trade;
- financial;
review.
The first 100 days build the evidence.
39.207Repair Before Replacement Pilot
Identify one asset class where repairability could produce savings.
Examples might include:
- furniture;
- equipment;
- fleet components;
- electronics.
Compare:
- repair;
- replacement;
- downtime;
- lifecycle.
39.208Open Playbook Starts Now
As the first systems are built, document:
- template;
- process;
- cost;
- measure.
Do not wait until Year Four to reconstruct how everything worked.
The open playbook should be built alongside the work.
39.209Publish Reusable Templates Early
Possible early reusable documents:
- pilot card;
- service-standard template;
- procurement forecast template;
- commitment register;
- authority map;
- public scorecard definitions.
A small municipality elsewhere could use them immediately.
39.210No Branding Requirement
Another municipality should not need to call its program:
- First to Action;
- Strong Vote;
- Civic Corps;
to reuse the method.
The process is what matters.
39.211First 100-Day Department Load Review
Ask:
Which departments are now overloaded because of implementation?
If staff capacity is becoming the bottleneck:
Slow down.
Do not sacrifice normal municipal service to prove the business plan is active.
39.212Prioritization Is Leadership
If ten projects compete for one department:
Council and administration need to rank them.
Saying:
Everything is priority one
is not leadership.
39.213No Staff Burnout Strategy
A four-year reform program cannot be built on:
- permanent overtime;
- unsustainable urgency.
Change needs to become normal work.
Not a 100-day sprint continuing for four years.
39.214Resident Workload Matters Too
Likewise:
Do not invite the same:
- business owner;
- senior;
- youth;
- volunteer;
to fifteen different City consultations.
Coordinate engagement.
39.215Consultation Calendar
Publish a public consultation calendar.
Residents can see:
- topic;
- date;
- purpose;
- decision it informs.
This makes participation easier.
39.216No Consultation After Decision
If the administration has already decided:
Do not call the meeting:
consultation.
Call it:
- information session;
- implementation briefing;
if that is what it is.
Words matter.
39.217Council Amendments Are Part of the Plan
Some initiatives will be:
- changed;
- narrowed;
- improved;
by Council.
The Mayor should not treat amendments as sabotage.
Collective decision-making can make the plan better.
39.218Opposition Is Information
If residents strongly oppose a pilot:
Understand why.
Possible explanations:
- misinformation;
- poor design;
- real cost;
- real harm.
Do not automatically conclude either:
critics are wrong
or:
critics must win.
Examine the evidence.
39.219Rights Do Not Go to Popular Vote
The Resident Government framework still applies.
No public poll determines:
- Charter rights;
- human-rights protection;
- due process;
- individual guilt.
Participation remains inside law.
39.220First 100-Day Rights Review
Every rights-sensitive pilot should have documented review.
Possible areas:
- sign regulation;
- public-space rules;
- data;
- resident verification;
- homelessness responses.
Do the review before enforcement.
39.221First 100-Day Conflict Review
Any initiative involving:
- Mayor-related platform;
- family business;
- significant supporter interest;
requires appropriate independent conflict process.
The new administration should set this precedent early.
39.222No Favour Economy
A supporter who says:
I helped elect you, now help my company
receives the same public process as everyone else.
The first 100 days should make that expectation unmistakable.
39.223No Punishment Economy
Likewise, an opponent does not receive:
- slower permit;
- less access;
- exclusion from committees;
because they opposed the Mayor.
Public authority is not electoral revenge.
39.224First Public Satisfaction Baseline
By Day 100, establish a simple baseline for resident experience with City Hall.
Possible questions:
Did you know where to start?
Was the answer clear?
Were you treated respectfully?
Did you understand the next step?
Was the response timely?
Keep surveys short enough that people answer them.
39.225Do Not Manipulate Satisfaction Surveys
Do not ask:
How satisfied are you with our excellent new service?
Use neutral wording.
39.226Complaint Data Is Improvement Data
Aggregate recurring complaints.
Ask:
What process produced this frustration?
Do not treat criticism merely as:
- reputation problem.
39.227Complaints About Staff
Individual employee concerns require appropriate:
- management;
- HR;
- labour;
process.
Do not publish personnel details to demonstrate transparency.
39.228Complaints About Mayor
Criticism of the Mayor is not a service risk.
Do not use:
- staff;
- police;
- City communications;
to retaliate against ordinary political criticism.
39.229First Community Assembly
If timing and Council calendar allow, hold the first Mayor's Community Assembly around or soon after Day 100.
Agenda:
Baseline
First decisions
First pilots
First failures
Major unresolved files
Resident questions
Do not fill two hours with speeches.
39.230Mayor Answers Jurisdiction Questions Honestly
If asked:
Why haven't you fixed healthcare?
answer:
Here is what the City controls, here is what Ontario controls, and here is what we have asked Ontario to do.
That is the purpose of the Authority Map.
39.231First 100-Day Intergovernmental Report
Publish one combined page showing:
SON
Relationship status.
Grey County
Roads, planning, housing, transit.
Ontario
Current asks.
Canada
Harbour and federal files.
Residents should understand that outside-government work is still measurable work.
39.232Do Not Claim Partnership Before Agreement
Use status such as:
Requested
In Discussion
Partner Agreed
Under Development
Do not put another organization's logo on a proposal before permission.
39.233Day-100 Budget Impact
Publish the complete incremental cost of first-100-day implementation.
Possible categories:
Existing Staff Time
Estimated where useful.
New Operating Expenditure
Approved amount.
Pilot Expenditure
Approved amount.
Professional Review
Legal, technical or consulting.
Future Capital Commitments
None unless separately approved.
Residents should know what reform costs.
39.234Reform Is Not Free
Open government can:
- save money;
- improve service.
It also requires:
- staff;
- technology;
- analysis.
Do not market reform as costless.
The question is:
Does the value exceed the cost?
39.235Day-100 Staffing Impact
Report whether the plan caused:
- new positions;
- temporary assignments;
- overtime;
- consultant use.
If no new position was created:
Good.
If one was justified:
Explain the business case.
39.236First 100-Day External Consulting Register
Where consultants were retained for implementation:
Show:
- purpose;
- amount;
- deliverable.
Do not hide reform consulting inside broad professional-services accounts where disclosure is appropriate.
39.237Use Consultants for Expertise, Not Decisions
A consultant can:
- analyze;
- recommend.
Council and staff remain accountable for public decisions.
Do not outsource political judgement.
39.238First 100-Day Risk Register
Publish a high-level list of major implementation risks.
Possible examples:
- staff capacity;
- road-transfer liability;
- grant expiry;
- harbour uncertainty;
- digital legacy systems;
- capital inflation.
The public should see what could derail the plan.
39.239Risk Has an Owner
Every significant risk needs:
- responsible department;
- mitigation;
- review date.
Unowned risks become surprises.
39.240First 100-Day Unknowns Register
This may be equally important.
List major questions still unanswered.
Examples:
Harbour liability
Unknown until federal records received.
Crossing cost
Unknown until current study.
Penny economics
Unknown until pilot model.
map.ca public structure
Unknown until independent review.
Saying:
unknown
is not weakness.
Pretending certainty is.
39.241What Should Be Completed by Day 100
Reasonable completion targets may include:
- public Commitment Register;
- Authority Map;
- financial baseline;
- Service Catalogue version one;
- No Wrong Door guide;
- Start-Up Desk version one;
- procurement forecast;
- first digital inventory;
- downtown quick-fix list;
- housing navigation version one;
- community partner standard;
- first scorecard.
These are institutional foundations.
39.242What May Be Piloting by Day 100
Depending on Council approval and staff capacity:
- First to Action;
- Resident Pulse;
- free senior transit;
- Shop Local payment education;
- Civic Square temporary use;
- Civic Corps;
- Snow Brigade;
- selected recreation access.
Not all need to launch.
39.243What Should Still Be Under Study
Likely examples:
- permanent 2nd Avenue changes;
- Penny scale-up;
- municipal delivery service;
- community purchasing cooperative;
- east-west crossing;
- harbour acquisition;
- large broadband infrastructure;
- map.ca transfer;
- resident data locker;
- large real-estate sign changes.
This is deliberate.
39.244What Should Still Be Forbidden by Governance
By Day 100 there should still be no:
- campaign-data transfer;
- police political direction;
- private platform preference;
- secret procurement;
- hidden public grant;
- unsupported property-value claim;
- unverified federal or provincial promise;
- public vulnerability database.
Some safeguards should never graduate from:
No.
39.245The 100-Day Public Report
The report should use the same format for every major commitment.
We Promised
Original commitment.
We Learned
Baseline and evidence.
We Did
Action.
It Cost
Actual amount.
Result
Measure.
Status
Complete, active, pilot, delayed, stopped.
Next
Year One action.
This prevents narrative-only reporting.
39.246Include the Source Promise
Where practical, the public report should show the original campaign wording beside the implemented version.
That lets residents see where an idea:
- stayed the same;
- changed.
No rewriting campaign history.
39.247Explain Necessary Changes
If the implemented policy differs:
Explain:
legal review changed this
or
the numbers did not support this
or
the partner declined
or
Council chose another approach.
Every change should have a reason.
39.248The Day-100 Mayor Statement
The Mayor's public statement should answer five questions.
What are we proud of?
What did not work?
What surprised us?
What did we change?
What are the next three priorities?
Keep it grounded.
39.249No 100-Day Victory Video as Substitute for the Report
Communications can summarize.
The detailed public record remains.
A short video is not accountability.
39.250First Independent Public Check
Where practical, ask appropriate:
- auditors;
- integrity;
- professional staff;
- public participants;
to validate the parts of the scorecard they legitimately own.
The Mayor should not certify their own savings.
39.251Finance Verifies Finance
Treasurer or appropriate financial staff verify:
- savings;
- costs.
39.252Department Verifies Service Data
The operational department confirms:
- service statistics.
39.253Residents Verify Experience
Resident surveys provide:
- user experience.
Do not substitute one source for another.
39.254Professional Services Verify Technical Claims
Engineers, planners and other qualified professionals verify:
- technical claims.
The Mayor does not certify bridge capacity from a spreadsheet.
39.255Public Trust Comes From Separation
The Mayor proposes.
Council decides where required.
Staff administer.
Professionals verify.
Residents judge.
That separation is healthy.
39.256First 100-Day Exit Decisions
At least one initiative may deserve:
Stop.
If so:
Stop it.
A first-100-day plan proving that City Hall can abandon a weak idea would be a sign of maturity.
39.257First 100-Day Expansion Decisions
Some pilots may show obvious benefit.
If so:
Do not expand automatically.
Bring:
- results;
- cost;
- staff impact;
to the proper approval process.
39.258First 100-Day Maintenance Decisions
Some pilots may simply continue at the same small scale for more evidence.
That is valid too.
Government does not need a dramatic answer to every question immediately.
39.259The 100-Day Principle of Reversibility
The less certain we are:
The more reversible the first action should be.
Temporary furniture before permanent plaza construction.
Pilot transit before permanent fare policy.
Open standard before platform transfer.
Study before bridge.
Due diligence before harbour ownership.
That is disciplined innovation.
39.260The 100-Day Principle of Proportionality
The greater the potential harm:
The stronger the review.
A public calendar can move faster than:
- resident data locker.
A bench pilot can move faster than:
- bridge.
A merchant survey can move faster than:
- municipal currency-like reward.
Good governance scales review to consequence.
39.261The 100-Day Principle of Independence
The Mayor should deliberately make parts of the system less dependent upon the Mayor.
By Day 100:
- commitments belong to the register;
- staff own implementation;
- public standards exist;
- conflicts are independently reviewed.
That is how a plan becomes institutional.
39.262The 100-Day Principle of Local Responsibility
Ask after every external-government meeting:
What can Owen Sound do now without waiting?
Do that.
39.263The 100-Day Principle of Honest Dependency
Then ask:
What truly cannot proceed without another government?
Put that into the appropriate:
- County;
- Ontario;
- federal;
register.
Do not pretend City Hall controls the answer.
39.264The 100-Day Principle of Public Choice
Where residents genuinely have meaningful alternatives to choose between:
Present them clearly.
Where professional or legal requirements constrain the choice:
Explain the constraint.
Participation improves when people know what is actually open for decision.
39.265The 100-Day Principle of Equal Service
Every new system must work for:
- supporters;
- critics;
- newcomers;
- long-time residents;
- renters;
- owners;
- businesses;
- private sellers;
- people with disabilities;
- people without smartphones.
No political customer class.
39.266The 100-Day Principle of Family and Community
Early reforms should make it easier to:
- start a business;
- add housing;
- get around;
- participate;
- help a neighbour;
- find an activity;
- understand City Hall.
These are practical ways municipal government can strengthen families and community without trying to control them.
39.267The 100-Day Principle of Canadian Capacity
Early Canadian-independence work should be modest and real.
Examples:
- identify critical suppliers;
- improve repair;
- understand technology lock-in;
- publish open municipal templates.
Not:
declare economic independence.
Capability first.
39.268The 100-Day Principle of Open Failure
By Day 100, the City should already have demonstrated:
A mistake can be acknowledged without a scandal being necessary.
If a pilot underperforms:
Report.
Adjust.
This lowers the political cost of learning.
39.269Day-100 Final Test
A resident should be able to ask:
What has changed since inauguration?
and receive a concrete answer.
Not merely:
The Mayor has been very busy.
The answer should include:
- systems;
- decisions;
- costs;
- results.
The First 100 Days Commitment
The first 100 days are where the four-year business plan begins proving whether it is a business plan or merely a campaign document.
The commitment is:
Publish every major promise and its status.
Assign every active commitment a responsible municipal owner.
Publish the authority behind each promise.
Make the first financial baseline understandable.
Use complete lifecycle costing for new proposals.
Verify savings before declaring an Efficiency Dividend.
Never call deferred maintenance a saving.
Open procurement information to small and local vendors without creating favourites.
Publish upcoming procurement opportunities where appropriate.
Begin testing technology exit before major renewals.
Cancel genuine duplicate technology costs only after records and continuity are protected.
Launch the first Service Catalogue.
Publish realistic service standards.
Make service standards mean a meaningful answer, not an automatic acknowledgement.
Implement No Wrong Door.
Launch the Start-Up Desk with one public contact and one coordinated municipal pathway.
Launch Before You Sign guidance for prospective businesses.
Implement the ten-business-day business standard only with clear eligibility and honest clock rules.
Waive only eligible City-controlled fees where Council lawfully adopts that guarantee.
Begin the Business Red-Tape Log.
Measure current local merchant payment costs before making public savings claims.
Make Shop Local payment choices voluntary.
Do not launch the Owen Sound Penny until funding, accounting, fraud, privacy and redemption are real.
Keep the Penny a reward, not a currency.
Launch a neutral local business directory only if it fills a real gap.
No paid basic ranking.
Complete the Shop Local delivery feasibility work before municipal delivery begins.
Prefer existing local couriers where they can solve the problem.
Test Community Pooling narrowly before considering a cooperative.
Give local merchants a fair first opportunity to meet pooled demand.
Launch a small First to Action pilot only after the backend service workflow exists.
Keep emergencies out of the municipal issue-reporting system.
Let councillors use the same ordinary service workflow as residents where appropriate.
Use Standing Work Lists to batch recurring problems.
Complete at least one root-cause review.
Test employee-generated improvement ideas.
Build labour partnership without bypassing collective bargaining.
Do not manufacture savings through layoffs or disappearing work.
Publish Infrastructure Index version one.
Allow Unknown as an honest condition where information is incomplete.
Publish a five-year capital look-ahead.
Test One Street, One Plan on a real corridor.
Prepare thoroughly for Grey County road transfers.
Judge hybrid planning by applicant service, cost, local knowledge and accountability.
Begin obvious downtown maintenance improvements without waiting for a megaproject.
Publish a Downtown Operating Plan.
Use temporary Civic Square improvements before permanent construction.
Apply the Tuesday Test.
Approve a 2nd Avenue East pilot only after traffic, business, resident, accessibility and emergency requirements are ready.
Publish success criteria before the pilot begins.
Publish the first River Spine Missing-Link Map.
Launch an Owen Sound Outside beginner guide.
Inventory equipment access before purchasing municipal inventory.
Publish the first Enthusiast Map and opportunity gaps.
Launch Housing Navigation.
Keep housing navigation separate from guaranteed approval.
Version-date outside housing programs.
Separate housing approvals from units actually built.
Inventory municipal land without promising its disposal.
Apply the Family-Friendly Neighbourhood Test to at least one practical area.
Publish the first Seniors Independence findings.
Bring the free-senior-transit business case to Council.
Pilot before making a permanent fare commitment where practical.
Evaluate the scheduled senior ride with Grey County and health partners rather than assigning their staff.
Launch winter help only with clear safety and privacy boundaries.
Publish the Community Safety baseline before claiming a Safety Dividend.
Approve the Safety Dividend rules before claiming financial savings.
Recognize increased police capacity as a possible dividend before budget savings exist.
Pilot Right Responder approaches only where the alternative responder is genuinely qualified.
Treat downtown safety as an infrastructure, service and policing question together.
Complete the first targeted lighting audit.
Establish a neutral Community Partnership Standard.
Publish significant municipal grants and in-kind support.
Keep grants separate from procurement contracts.
Use the same public-service standard for faith and secular partners.
Launch or improve a community resource directory without mapping vulnerable residents.
Create a free community-calendar standard without paid ranking or behavioural tracking.
Approve a Civic Corps pilot only after employment, volunteer, co-op, safety and privacy roles are clear.
Pay young people when the work should be paid.
Never turn Civic Corps into free replacement labour.
Map youth opportunities, not youth.
Use students to gather public information only where staff can validate it.
Begin responsible-data education with existing community institutions.
Expand public Wi-Fi only where an actual access gap and sustainable operating model exist.
Launch a recycled-device pilot only if privacy, battery, security and support questions are solved.
Complete Digital Systems Index version one.
Adopt practical municipal AI rules.
Keep humans accountable for consequential municipal decisions.
Complete the first map.ca public-purpose and ownership review.
Do not rush a map.ca transfer to satisfy a 100-day deadline.
Publish the platform-neutral Public Property Information Standard before adopting a proprietary property platform.
Enforce existing sign rules before rewriting them.
Begin sign consultation without promising a predetermined ban.
Establish the first leadership relationship with Saugeen Ojibway Nation by listening first.
Do not measure reconciliation by whether a document is signed in 100 days.
Ask Canada specific questions concerning harbour ownership, transfer, assets, dredging, liabilities and funding.
Publish what Canada answered and what remains unanswered.
Do not acquire the harbour before complete due diligence.
Prepare Grey County road, planning, housing, paramedic and transit files for real decisions.
Bring Owen Sound's regional transit priorities forward early enough to matter.
Publish a short Ontario Ask Book.
Ask Ontario precisely for strong-mayor reform if Council wants it.
Publish verified provincial mandate costs.
Ask Ontario for specific municipal pilots rather than vague autonomy.
Publish a short Federal Ask Book.
Correct outdated federal housing claims.
Prove a broadband gap before asking for broadband infrastructure money.
Scope the east-west crossing as an evidence study, not a predetermined construction project.
Include the no-build alternative.
Preserve reasonable corridors while the evidence is gathered.
Launch Resident Pulse with honest limits on what self-selected participation represents.
Keep phone and paper options for important consultations.
Protect political opinion from permanent profiling.
Schedule the first Mayor's Community Assembly.
Publish the first full State of the City update.
Correct any material campaign assumption that evidence has disproved.
Publish the first complete public scorecard.
Define completed, delayed, stopped and missed honestly.
Publish the cost and result of every meaningful pilot.
Test accessibility before systems become entrenched.
Apply privacy review according to risk.
Publish cybersecurity governance without publishing vulnerabilities.
Begin Canadian supply-resilience work with a few critical systems rather than slogans.
Document reusable municipal tools as they are built.
Do not overload staff or residents in the name of speed.
Publish consultation dates and purposes.
Allow Council to amend the plan.
Treat opposition as information rather than disloyalty.
Keep rights outside popularity contests.
Apply the conflict firewall immediately and visibly.
Treat supporters and opponents equally at City Hall.
Establish a resident-service satisfaction baseline.
Publish the first 100-day implementation cost.
Publish material consulting and staffing impacts.
Publish the major implementation risks and unknowns.
Stop at least any initiative that evidence clearly shows should stop.
Expand pilots only after results are reviewed.
Prefer reversible first steps when uncertainty is high.
Make the operating system less dependent upon the Mayor as the term progresses.
At Day 100, residents should not be asked to trust that change is happening behind the scenes.
They should be able to see it.
Not through slogans.
Through:
- registers;
- baselines;
- service standards;
- pilot cards;
- costs;
- decisions;
- missed targets;
- corrected assumptions;
- public measures.
The first 30 days answer:
Where are we?
The first 100 days answer:
Can this administration actually turn evidence into action?
That is the test.
Build the system. Make the first decisions. Test the uncertain ideas. Publish the results. Correct what is wrong. Then enter Year One with evidence rather than momentum alone.